21 CFR Part 820 · Quality System Regulation (before Feb 2, 2026)

21 CFR 820.75

Process validation

21 CFR 820.75 is the regulation titled “Process validation” in 21 CFR Part 820, Quality System Regulation (before Feb 2, 2026). Since 2021, 51 FDA warning letters have cited it.

Part 820 changed when FDA's Quality Management System Regulation took effect on February 2, 2026. This is the earlier text these letters cite.

Letters citing it
51 since 2021
Jan 1 to Oct 30, 2026
5 against 12 on the same dates in 2025
Most often cited with
21 CFR 820.30, in 37 letters
Closed out
16% of these letters have a published close-out
See the 51 letters citing 21 CFR 820.75 →

Letters citing it, by year issued

All are medical device letters. 2026 runs to Oct 30, 2026. Pick a year to see its letters.

  1. 42021
  2. 82022
  3. 132023
  4. 72024
  5. 142025
  6. 52026

What FDA writes when it cites it

The finding headings that cite 21 CFR 820.75 most often, as written in the letters.

  • 4 lettersFailure to ensure that when the results of a process cannot be fully verified by subsequent inspection and test, the process shall be validated with a high degree of assurance and approved according to established…
  • 2 lettersFailure to adequately ensure that when the results of a process cannot be fully verified by subsequent inspection and test that the process shall be validated with a high degree of assurance and approved according to…
  • 2 lettersFailure to adequately ensure that when the results of a process cannot be fully verified by subsequent inspection and test, the process shall be validated with a high degree of assurance and approved according to…

The regulation

Read the text of 21 CFR 820.75 (eCFR, as of Jun 1, 2025)

(a) Where the results of a process cannot be fully verified by subsequent inspection and test, the process shall be validated with a high degree of assurance and approved according to established procedures. The validation activities and results, including the date and signature of the individual(s) approving the validation and where appropriate the major equipment validated, shall be documented.

(b) Each manufacturer shall establish and maintain procedures for monitoring and control of process parameters for validated processes to ensure that the specified requirements continue to be met.

(1) Each manufacturer shall ensure that validated processes are performed by qualified individual(s).

(2) For validated processes, the monitoring and control methods and data, the date performed, and, where appropriate, the individual(s) performing the process or the major equipment used shall be documented.

(c) When changes or process deviations occur, the manufacturer shall review and evaluate the process and perform revalidation where appropriate. These activities shall be documented.

Text from eCFR as of Jun 1, 2025.

Cited alongside it

Regulations that appear in the same letters as 21 CFR 820.75.

Latest letters citing it

The 3 letters citing 21 CFR 820.75 that FDA posted most recently.

See the 51 letters citing 21 CFR 820.75 →
For regulated teams

Put this kind of reading to
work on your own records.

Botable builds and runs a custom AI layer around the software you already use, so your team can do the job you hired them for.

Counts include every citation in a letter, as the Letters filter does. How this database is built.

Every letter by dateHow this database is built

FDA Warning Letter Alerts

Share this view

Send the same filters, search and view to a colleague.

You choose what to post or send. Sharing a link does not change access to this site.