21 CFR Part 111 · Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements

21 CFR 111.255

What is the requirement to establish a batch production record?

21 CFR 111.255 is the regulation titled “What is the requirement to establish a batch production record?” in 21 CFR Part 111, Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements. Since 2021, 12 FDA warning letters have cited it.

Letters citing it
12 since 2021
Jan 1 to Oct 30, 2026
2 against 2 on the same dates in 2025
Most often cited with
21 CFR 111.260, in 12 letters
Closed out
17% of these letters have a published close-out
See the 12 letters citing 21 CFR 111.255 →

Letters citing it, by year issued

All are drug letters. 2026 runs to Oct 30, 2026. Pick a year to see its letters.

  1. 02021
  2. 32022
  3. 52023
  4. 02024
  5. 22025
  6. 22026

What FDA writes when it cites it

The finding headings that cite 21 CFR 111.255 most often, as written in the letters.

  • 1 letterYou failed to establish a batch production record (BPR) that satisfies the requirements of 21 CFR 111.255 and 111.260. For example, the BPRs for the BP Nat Relief, 11 Lot **(b)(4)**, and Edema NatRelief 6, Lot…
  • 1 letterYou failed to establish product specifications for the identity, purity, strength, and composition of the finished batch of the dietary supplement, and for limits on those types of contaminants that may adulterate, or…
  • 1 letterYou failed to prepare a batch production record every time you manufactured a batch of dietary supplement as required by 21 CFR 111.255(a). Specifically, during the inspection, your firm did not have batch production…

The regulation

Read the text of 21 CFR 111.255 (eCFR, as of Sep 1, 2026)

(a) You must prepare a batch production record every time you manufacture a batch of a dietary supplement;

(b) Your batch production record must include complete information relating to the production and control of each batch;

(c) Your batch production record must accurately follow the appropriate master manufacturing record and you must perform each step in the production of the batch; and

(d) You must make and keep batch production records in accordance with subpart P of this part.

Text from eCFR as of Sep 1, 2026.

Cited alongside it

Regulations that appear in the same letters as 21 CFR 111.255.

Latest letters citing it

The 3 letters citing 21 CFR 111.255 that FDA posted most recently.

See the 12 letters citing 21 CFR 111.255 →
For regulated teams

Put this kind of reading to
work on your own records.

Botable builds and runs a custom AI layer around the software you already use, so your team can do the job you hired them for.

Counts include every citation in a letter, as the Letters filter does. How this database is built.

Every letter by dateHow this database is built

FDA Warning Letter Alerts

Share this view

Send the same filters, search and view to a colleague.

You choose what to post or send. Sharing a link does not change access to this site.