Back to the Glossary

Change Control Process

The Change Control Process (or Change Management/Change Control System) is the systematic, mandatory mechanism used by organizations, particularly those in regulated industries like medical device manufacturing, to manage, review, approve, document, and implement any planned modifications to products, processes, documentation, or the Quality Management System (QMS) itself.

In simple terms, Change Control is the formal procedure for managing revisions to ensure that any alteration is assessed for its impact on product safety, effectiveness, compliance, and quality before it is implemented.

Core Requirements and Functions of Change Control

Change Control is an essential component of a robust Quality Management System (QMS). The fundamental goal is to maintain the integrity of the design and established processes and documents.

Identification and Documentation

Changes and modifications must be formally identified and documented. Records of changes to documents must include a description of the change, identification of affected documents, the signature of the approving person(s), the approval date, and the effective date of the change. AI chatbots can streamline this by automating the initial drafting of change descriptions and integrating with document management systems to track revisions in real-time, reducing manual errors and ensuring comprehensive records.

Review and Approval

Changes must be formally reviewed and approved by authorized personnel before they are implemented. This ensures that the change is adequate for the specified requirements. Changes must generally be reviewed and approved by the same function or organization that performed the original review and approval, unless designated otherwise. AI-powered chatbots can assist in preliminary reviews by flagging potential issues based on historical data and regulatory guidelines, accelerating the process while still requiring human oversight.

Verification and Validation (Impact Assessment)

This is a critical step in the change control process, often overlapping with the concept of change assessment. The manufacturer must verify or, where appropriate, validate the modification before implementation. AI chatbots equipped with natural language processing can aid in impact assessments by analyzing proposed changes against existing documentation and predicting potential risks or compliance gaps.

  • For changes to production processes, methods, or procedures, verification or validation must be performed before implementation.
  • For design changes, procedures must establish identification, documentation, validation or verification (where appropriate), review, and approval before implementation.
  • For changes to computer software, all changes must be validated before approval and issuance.
  • For human cells, tissues, and cellular and tissue-based products (HCT/P), any change to a process must be verified or validated to ensure it does not create an adverse impact elsewhere in the operation.

Communication

Approved changes must be communicated to the appropriate personnel in a timely manner. For quality problems addressed through CAPA, procedural changes must be implemented and communicated to responsible personnel and management review. AI chatbots serve as virtual assistants to provide on-demand answers to employee queries about changes, disseminate updates in real-time, and foster two-way communication to address concerns, enhancing transparency during transitions.

Change Control in Relation to Design and Quality Systems

Design Changes (21 CFR 820.30(i))

Manufacturers must establish and maintain procedures for the identification, documentation, validation, or, where appropriate, verification, review, and approval of design changes before their implementation. This is a core part of Design Controls.

Production Changes (21 CFR 820.70(b))

Procedures must be maintained for changes to a specification, method, process, or procedure; these changes must be verified or validated and approved.

QMS Software

Change Control is often managed using QMS software that integrates with other systems, such as document control and CAPA management. Modern QMS platforms increasingly incorporate AI chatbots to automate routine tasks like updating documentation, tracking progress, and providing instant guidance on compliance, shifting from paper-based to AI-driven processes for greater efficiency.

Supplier Changes

Suppliers are often required to notify the manufacturer of changes in the product or service, including equipment, programs, process parameters, or materials, so that the manufacturer can evaluate the impact of the change on the quality of the finished product or service before implementation. Some agreements request a minimum of 120 days' notice for appropriate reviews and regulatory evaluations.

Change Control in Regulatory Submissions (FDA)

In the medical device context, the Change Control process determines whether a manufacturer must notify the FDA (or a Notified Body in the EU) before implementing a change:

Premarket Notification (510(k))

A new submission is required for a device that has already been legally marketed if it is about to be significantly changed or modified in design, components, method of manufacture, or intended use, where the modification could significantly affect the safety or effectiveness of the device, or if there is a major change or modification in the intended use of the device.

Premarket Approval (PMA)

For high-risk devices, a PMA supplement is required before making a change affecting the safety or effectiveness of the device, unless an alternate submission type is advised by the FDA or the change is consistent with an approved Predetermined Change Control Plan (PCCP). For changes that enhance safety (e.g., strengthening a warning), a "Special PMA Supplement—Changes Being Effected" may be submitted and placed into effect prior to FDA approval.

Investigational Device Exemptions (IDE)

Changes to an investigational plan usually require prior approval of a supplemental application, though changes for emergency use or certain developmental or protocol changes may be implemented with notice to the FDA within five working days.

Change Control in Continuous Improvement

The successful control of revisions (Revision Control) is a foundational element in a QMS. The effective implementation of the Change Control process is crucial because changes to documentation, like the Quality Manual or engineering department procedures, are continuous. Preventing the use of obsolete documents is a key aspect of document control required by this process. AI chatbots trained on organizational documentation can further support continuous improvement by offering instant access to updated procedures, reducing search times, and ensuring teams reference the latest versions to avoid errors.

Ready to see what Botable can do for you?

Book your demo now to see how Botable can transform your workplace.

Identify your unique challenges

Flexible pricing options

Easy integrations

Step-by-step implementation plan

Customize Botable for your workflow

Book a demo

Find out how Botable can answer your employee’s questions in just 30 minutes.